Skip to content

Testimonials

What our clients say

Claxton’s aim is to continue to provide clients with unrivalled solutions to their offshore operating requirements. Here’s what some of our clients say:

RAK GAS

 

“Thank you for the excellent support and hard work from the Claxton team during the Saleh wellhead maintenance project. It was a pleasure to work with the Dubai team”.

RAK Gas
GSP

"Thank you for the regular updates and pulling out all the stops to hit the delivery date for the running tool. It is greatly appreciated and will be remembered in the future when we have requirements that fall under your scope."

Grup Servicii Petroliere

Shell

 

“Thank you for the efficient preparation of the 13 5/8” Connector and the flexibility you have afforded us. Please also pass on our appreciation to the personnel on the shop-floor who have assisted with a delivery that has allowed us to continue with our abandonment.”

Shell
Total

"Thank you for your efforts. Claxton's high level of customer service has been noted and I'm sure will be remembered going forward."

Total E&P

NAM

 

“Thanks for your support to Sami today wrt 21-1/4” spool for our operation. This is much appreciated and in line with the customer oriented approach of Claxton I have also enjoyed in the past.”

NAM
Maersk

"Naturally, we are delighted to have successfully completed the first rigless recovery of a stuck BHA in the North Sea. The key to the success of this project was teamwork. The simultaneous operations were conducted smoothly and with great efficiency."

Maersk

Centrica

 

“We are very happy with the pro-active attitudes of all the Claxton team on-board. All questions were answered confidently and professionally, and the guys attitude/participation towards safety was outstanding”

Centrica
DNO

"Claxton provided a seamless service in terms of engineering, planning and final installation of the retrofit centralizers."

DNO

Total

 

 

“We have greatly appreciated the commitment and dedication you have shown in sharing the load and delivering solutions to a very challenging timescale.”  

Total E&P
BG Group

 

“We have worked with Claxton on numerous successful projects and I’m always confident that we’ll work effectively together and get the job done right.” 

BG Group
PSN

"Claxton has a lot of experience of drilling-associated work and was able to provide that quick response with an efficient design, build and install service."

PSN

Perenco

 

“Your preparation as far as I am concerned was very good, you guys are well organized, excellent prepared paperwork. There are a few companies who can learn from that!” 

Perenco
Ensco

"The upgrade to the tensioning system provided by Claxton is allowing us to use the jack-up to drill a well that would normally have required a semi-submersible rig."

ENSCO 102

DNO

 

“During an intense period for well operations, the Claxton team went about their business in a safe and professional manner to install well-engineered centralizers right first time.” 

DNO
Maersk

"This was a very challenging piece of work requiring integrated planning across many departments and companies, not to mention the extensive amount of design, manufacturing and testing of equipment. Thanks especially for the job by Claxton in double-quick time."

Maersk

Total

“The offshore drilling supervisors reported back to Total that they were extremely impressed with the Claxton system and engineers – never before have Total removed a tubing bonnet within three hours.”

Total E&P
Centrica

“[The] Riser is looking good and more importantly is tested. So, well done for the delivery there. Very much appreciated by all at Centrica. I don’t think there’s another company that could have delivered in our tiny lead time.” 

Centrica