Skip to content
Contact us

Conductor Recovery

P9050066

About

Robust, modular conductor recovery system

Our conductor recovery system has been designed to recover oil and gas conductors from offshore installations without the use of a jack-up rig or platform-based drilling derrick.

Fully integrated with other Claxton decommissioning equipment, our system benefits from a modular low-profile design, yet is robust enough to pull up to 300 tonnes and can recover in sections up to 40ft (12.2m) in length.

Suited to larger platforms, the system is fully NORSOK compliant and has the flexibility to be adapted to the specific requirements of your platform.

Speak to an expert

The system works in harmony with our subsea abrasive cutting system, drilling and pinning tooling, and bandsaws, and can even skid from well to well under its own power.

The modular conductor recovery system can also be configured to accommodate well-control packages, allowing the workover of live wells and full P&A scopes.

  • Ideal for larger platforms
  • Modular, flexible and low-profile design
  • NORSOK-compliant
  • Fully integrated with other Claxton decommissioning equipment
Tower aspect ratio 31 23
Wellraizer main 01 768x620 1 aspect ratio 31 23
Wellraizer rigless recovery aspect ratio 31 23
Picture2 2 aspect ratio 31 23

Get in touch

Discover how Claxton can help you