Recover submerged structures quickly and efficiently
Our hydraulic pipe-handling tool is ideal for recovering submerged structures in abandonment and decommissioning projects.
Itβs designed to handle subsea pipelines and achieves fast deployment and recovery times due to its flexible lifting and power options.
The tool comes complete with its own umbilical and power unit and requires as little as 60lpm at 350bar to complete a lift. It can be deployed while connected or through a hydraulic hot stab with an ROV.
Both single-clamping ends can be removed and used individually, with the adaptable centre spreader beam length changed out as required.
- Work carried out by an experienced team
- Can lift up to 28 tonnes
- Can handle complete bundle lifts of up to 6 x 12β pipes in lengths of up to 20 metres and a pipe of up to 42β in a single lift
- Single grab can be used individually
- Umbilical can be hot stabbed, allowing faster cycle times with no need to recover umbilical during loading/unloading