Skip to content
Contact us

Pile Install – Hydro Hammers

Hammer offshore operations aspect ratio 1 1

About

Using a fleet of S-90 and S-150 Hydro Hammers, pile installation by means of driving is a clean, fast, reliable and safe method of top section installation providing superior load bearing capacity.

Speak to an expert

  • Used in conjunction with installations of manifold PLEM/PLETS, Initiation Piles and other subsea infrastructure.​
  • We also supply a variety of pile handling tools including ILT (Internal Lifting Tool) and PLT’s (Pile Lifting Tool).​
  • Subsea Piling Services specializing at water depths of up to 1,000m.​
  • DNV and SOLAS compliant, we only use biodegradable oils.​
  • Typically, suitable for driving piles up to 60” OD subject to geotechnical investigation.​
  • Hammers that fully controllable in terms of blow rates and energy output.​
Hammer offshore operations aspect ratio 31 23
1743410434593 aspect ratio 31 23

Learn more

Pile install case studies

  • Pile Installation for Challenging Marine Project

    Nearshore marine - pile installation in Great Yarmouth Harbour

    Cs 2025 014 uk hammers nearshore marine
  • Two Projects, Two Continents in Under a Month

    Claxton completed Hammer projects in the UK & Canada back to back

    Hammer vessel lifting

Get in touch

Discover how Claxton can help you