Skip to content
Contact us

Conductor Install – Hydro Hammers

Imm 24 042 aspect ratio 1 1

About

Install top-sections quickly and safely for improved load-bearing

Using driving for conductor top-section installation is a clean, fast, reliable and safe method that offers superior load-bearing capacity and improved well integrity.

Conductor driving is typically used to install conductor strings of 20”–42” in diameter using a fleet of S-90 and S-150 Hydro Hammers.

It offers unrivalled minimum disturbance to the adjacent conductor formation, providing excellent stability for the subsequent well during its construction and producing life.

Speak to an expert

Compared with traditional drill and set methodologies, conductor driving also saves costly rig time on cement operations, cement top-ups and formation washout issues.

We’ll provide extensive technical assurance through a comprehensive driveability assessment based on your own geotechnical data and our extensive archive of global drive logs.

We’ll also evaluate feasibility based on your required setting depth, analysing driving behaviour and mitigating the risks of early refusal well in advance of project execution.

  • Install conductor top sections quickly, reliably and safely
  • Save rig time and cost
  • Full technical support and analysis to address risks before they arise
  • Wide range of conductor-handling equipment to support individual projects or turnkey operations
Imm 24 042 aspect ratio 31 23
Whatsapp image 2024 10 02 at 3.41.57 am 1 aspect ratio 31 23

Get in touch

Discover how Claxton can help you