The Challenge
Claxton supported Allseas with the removal of Spirit Energy’s DP3 and DP4 Morecambe Bay jackets in the East Irish Sea. Working closely together to create an engineered solution to provide tooling to be used in a challenging location due to shallow waters, tough tidal conditions and poor visibility for ROV operations.