The Challenge
Claxton Engineering was engaged by BP to deliver an 18¾” 7,000psi subsea riser package on an accelerated schedule for their Cypre and Ginger drilling campaign. With rig downtime carrying significant operational and financial implications, speed of delivery was critical.
The scope included the provision of a complete subsea riser package comprising primary and backup riser joints, H4 connectors, a hydraulic control system, handling tools, and associated tensioning and running equipment. In parallel, critical components including connector guide funnels, C-plates, strakes, and a backup stress joint required fast-track engineering and manufacture.
The compressed schedule presented a significant logistics challenge, requiring more than 200 tonnes of equipment to be mobilised by air freight to Trinidad. To meet the client’s programme, the mobilisation was executed across four dedicated cargo flights, including a heavy-lift Antonov AN-124 and three jumbo jet aircraft. Coordinating the preparation, transportation and prioritised delivery of this equipment within the four-week timeframe was critical to minimising potential rig downtime and maintaining the drilling schedule.