The Challenge
Due to sinking jacket foundation re-development of the subsea structure was required. This included the cutting and removal of out riggers and riser guard structure.
Most parts of the infrastructure were accessible for cutting with standard diamond wire and abrasive water jet, but due to the location and restricted space certain areas required an out of the box solution.