Additional conductor guide extends platform life

Additional-slot-banner2
These shots of the additional conductor guide being installed show how Claxton’s engineering team overcame the challenges of fitting an additional guide to existing infrastructure

Extensive options for structural asset life extension

Project engineer, Bob Leggett takes satisfaction from having been part of an imaginative project to prolong the life of an installation that was past its production peak. He says, “Claxton has previously undertaken projects to regain entry to reservoirs via existing well slots, so-called slot recoveries. By adding an entirely new additional conductor guide  and associated platform slot, you minimise the effect on production from the existing wells; though, as here, you have more structural issues to deal with. Each approach has its advantages. What is important is that the range of options available to operators seeking to extend the life of existing structures has been extended.”

Additional conductor guides are just one option in a range Claxton can provide to cost effectively extend the life of your assets – contact us today to see how we can help.

DOES YOUR CHALLENGE NEED A BESPOKE SOLUTION?

Contact us and we will put you in touch with the person best placed in our team to answer based on your unique enquiry. Our engineers are specialists in their own fields and ready to take on any challenge!

Asset life extension buyers guide Asset life extension buyers guide
E-book download
Asset Life Extension Buyers Guide

Download our structural asset life extension buyers guide for details on slot recovery techniques, centralizers and replacement platform guides.

Download
Asset life extension case study pack Asset life extension case study pack
E-book download
Asset Life Extension Case Study Pack

Download the Claxton structural asset life extension case study pack for details on slot recovery techniques, centralizers, replacement platform guides and other bespoke solutions.

Download