Skip to content

Claxton Blog

Engineering insights from our industry thought leaders

Featured

West Africa E&P – Outlook for 2020 and beyond
West Africa E&P – Outlook for 2020 and beyond
West Africa is experiencing a higher demand for energy with an increasingly urban population, economic development and high European demand for its low sulphur oil. In this...
Read more
  • 2019 Year in Review
    2019 Year in Review
    As the holiday season and end of the year is upon us, here at Claxton we reflect on 2019 as being a productive 12 months. It is interesting to look back at the past year, and...
    Read more
  • OGUK’s Decommissioning Insight 2019 – the Claxton executive summary
    Decommissioning
    OGUK’s Decommissioning Insight 2019 – the Claxton executive summary
    During November OGUK published their tenth Decommissioning Insight. The report tracks the emergence of a new phase in the life of the North Sea and reflects the accelerating...
    Read more
3 signs that asset life extension is taking off in the Arabian Gulf
Late-Life
3 signs that asset life extension is taking off in the Arabian Gulf
Despite a slump in oil prices recently, advancements in...
The one thing to consider when choosing a well abandonment contractor
Decommissioning
The one thing to consider when choosing a well abandonment contractor
Claxton’s SABRE™ abrasive cutting system was used to...
How do you solve the problem of ageing assets in the North Sea?
How do you solve the problem of ageing assets in the North Sea?
It was at a recent event in Norwich, organised by the East...
Six ways Claxton can help to reduce the cost of your offshore projects
Drilling Production Late-Life Decommissioning
Six ways Claxton can help to reduce the cost of your offshore projects
Although current concerns about oil price mean operators...
The proven subsea abrasive cutting tool for your decommissioning project
Decommissioning
The proven subsea abrasive cutting tool for your decommissioning project
Well abandonment and subsea cutting projects often throw up...
4 challenging asset life extension projects
4 challenging asset life extension projects
With over half the platforms in the North Sea being at...
Slot recovery explained: extending the life of your offshore operations
Late-Life
Slot recovery explained: extending the life of your offshore operations
Field maturity and ageing infrastructure has meant...
Eliminating wasted rig time during conductor installation operations
Late-Life
Eliminating wasted rig time during conductor installation operations
Currently in use by two major North Sea operators...
3 successful offshore brownfield developments
Production
3 successful offshore brownfield developments
Continued investment in offshore brownfield developments...