Project profile: 18.3/4" ID subsea drilling riser system supply

Lifecycle stage
Drilling

 

A Claxton tension system was on the riser, combined with our proprietary positive grip tension ring – a design Claxton pioneered to reduce space-out issues for clients

Handling the tension: A Claxton tension system was on the riser, combined with our proprietary positive grip tension ring – a design Claxton pioneered to reduce space-out issues for clients.

OUR SOLUTION:

Claxton called on our large inventory of riser equipment – which includes a rental inventory of over 4,000 supporting items – and in-house design to deliver a complete package for the 6-well campaign.

The high-pressure flanged riser system utilised custom designed (make-up time optimised) flanges and high-grade material pipe (X65 & X80) to offer a full bore, 5,000 psi SWP system from the subsea wellhead to the surface BOP.

We supplied the riser joints pre-studded – taking the job off the critical path and reducing running time and handling

Continuous improvement: We supplied the riser joints pre-studded – taking the job off the critical path and reducing running time and handling. We’ve already identified further improvements to this process for future projects.

 The project successfully demonstrated ‘in field’ performance of new build equipment including the Claxton-designed NT-2 hydraulic riser handling tool, bolt tensioning systems and riser spider assembly.

THINKING ABOUT YOUR RISER REQUIREMENTS?

Claxton’s riser engineers have been supplying risers since the early 1990s and we’ve been responsible for over 190 riser projects since 2005 alone.

Learn more about how we can make your next project happen by downloading our riser case study pack.

 

Risers & tensioning case study pack
E-book download

Drilling Riser and Tensioning Case Study Pack

Download the Claxton drilling riser and tensioning case study pack to discover how we have saved clients time and money through innovation.

Download