Skip to content

Operator benefits from retrofit conductor guide centralizer

Lifecycle stage
Late-Life

THE RESULT

Subsea 7 reported that the work offshore to install the centralizers went well and was devoid of incident. It was agreed that the success of the project was helped by the excellent interaction between Claxton and the client.

Claxton project engineer Ann Vicens-Morton said about the project, “Collaboration is always the key. There has to be a willingness to discuss all aspects of the job and to work together to devise a practical, installer-friendly solution to the challenges expected offshore.”

“Solid preparation up-front has the power to save considerable time and, therefore, money during the offshore operations.”

ADDING VALUE

Claxton was initially asked to supply 10 of the centralizers, all for 26-in. conductors: eight suitable for fitting in 36½-in. guides and two for 34-in. guides.

Later, Subsea 7 added one more of the latter design to the order and asked for this to be supplied within two weeks. Claxton delivered the centralizer 11 days after the formal request whilst completing the work for the original centralizers query.

YOUR CENTRALIZER EXPERTS

Ranging from robust ‘new build’ designs through to retrofit models to extend asset life, our centralizers provide the strength and support needed to secure your conductors – assuring maximum integrity throughout the life of the conductor.

From the cellar deck through to subsea guides, our centralizer designs and our installation processes are field-proven.

If you’d like to take advantage of our expertise, after installing over 5,000 conductor guide centralizers, download our free Centralizer Buyers Guide by clicking here, or get in touch with us directly.

Centralizers buyers guide
E-book download

Centralizers Buyers Guide

Download Claxton’s centralizer buyers guide for in-depth details on finding a bespoke solution for even the most challenging centralization projects.

Download