Skip to content

Eliminating wasted rig time during conductor installation operations

Lifecycle stage
Late-Life

OPERATIONAL FLEXIBILITY – ASSURED

We’ve worked to ensure the Conductor cementing support system offers maximum operational flexibility for operators. For instance, space is always at a premium offshore – so the CCSS is designed so the jacking element can be deployed and retrieved through the rig’s diverter housing (49.5″ diameter ID housing).

Thanks to a compact design, the system uses heavy-duty castors and does not require the use of a crane or rig to reposition within the well bay/platform structure.

The system can be split in half, giving you flexibility on whether you run the conductor before or after the system has been put in place.

Learn more about the specs for new tool – and download the datasheet – on our conductor cementing support system product page or ask us a question in the comment section below…

Risers & tensioning case study pack
E-book download

Drilling Riser and Tensioning Case Study Pack

Download the Claxton drilling riser and tensioning case study pack to discover how we have saved clients time and money through innovation.

Download