Comprehensive, bespoke and flexible services help an operator plug and abandon their wells in the southern North Sea.

The field had been producing natural gas for over 40 years. At its peak, it supplied around 10% of the UK’s gas requirements. In the 1990s, an infield drilling programme and new production technologies revitalised the field. Nevertheless, many older wells had reached the end of their operational lives, prompting the beginning of a multiyear well abandonment campaign.

one-stop-decommissioning-solution

Obsolete Interfaces And High Demand

The age of the wells is challenging. Many of the well interfaces are obsolete, which means that some well intervention equipment needed to be developed specifically for the campaign. The Claxton decommissioning team worked closely with the operator to understand the project requirements.

From the outset, it was clear that Claxton’s SABRE™ subsea abrasive cutting system would be a vital part of any campaign to cut and recover the wells. However, SABRE’s growing reputation meant that the units were in high demand, with healthy backlogs, and not immediately available.

Rapid Reaction

Claxton promptly manufactured a new SABRE™ unit with a reduced footprint designed specifically for the clients
campaign. This unit was deployed in December 2013 and has since been in continuous service. The system is reliable, flexible and easily moved between platforms and vessels. It also has a low environment impact, using only naturally occurring garnet minerals, air and water in its transonic-speed abrasive jet, which is capable of severing wells with multiple cemented casings. The welldewatering packer was also upgraded.

The project scope also includes supply of on-site machinery, surface riser systems, bespoke interfaces, bandsaws and drills to cut the recovered sections, and debris caps and slings for safe multistring backload.

Benefits

The operator is using Claxton’s equipment and services to improve its decommissioning efficiency and capacity, which helps to reduce costs and release resources for other projects. The company was able to take advantage of Claxton’s extensive riser inventory to get what it needed quickly.

Claxton’s on-site machinery and skilled engineers were also able to swiftly deliver bespoke equipment. Robert Leggett, Decommissioning Product Leader, Claxton, said, “We really wanted to work with the operator on its campaign. I am delighted that we were able to react quickly, including manufacturing a SABRE™ system specifically for the project. It is great to see this and our casing-recovery system in two years’ continuous service and with more work to do.

The ability of our multi-skilled team to move from one operation to another without the need for continuous crew changes was particularly valued. We are now collaborating with the client on new systems and methods of work to further increase operational efficiency.

If you would like to view the full case study as a PDF, you can do so here.