Your project needs to deliver. Trust Claxton to make it happen.

Since 1985 Claxton has been delivering pragmatic, safe, cost effective solutions to operating challenges across the life of field. From an unrivalled drilling riser supply capability, to the world’s first-ever rigless platform well abandonment to structures and asset life extension, Claxton has a proven track record in project delivery.

Over 270 operators, contractors and rig owners have trusted Claxton with their projects – read our case studies to find out why.

Raising the bar for risers
Our jack up drilling riser supply capability is unrivalled – we offer more pressure, connection, material and bore size options than anyone else. Claxton holds one of the largest riser stocks in Europe for call off all around the world – including riser systems up to 12,200psi SWP complete with riser tensioning and all ancillary tooling.

Learn more about drilling risers from Claxton.

Pioneering rigless decommissioning
Since performing the world’s first rigless platform well abandonment in 2003, we’ve continually invested in our decommissioning tooling to provide a complete suite of proprietary technologies. From the pioneering Suspended Well Abandonment Tool SWAT™, to SABRE™ abrasive cutting, our proprietary technology has been used successfully on over 260 well abandonment and conductor cutting / slot recovery projects.

Discover how our tooling and services can cost effectively deliver your well abandonments, here.

Central to Success
Claxton has worked together with our clients to install over 4,800 conductor guide centralizers and over 55 major pre-drilled developments benefit from Claxton designed – and installed – drilling templates.  Complementing this innate understanding of structural issues involving conductors, our in-house design and R&D teams have delivered replacement conductor guides and guide arrays that significantly extend the life of operator’s assets.

Learn more about our templates and structures.

 

Back to top